Keep the sink on its existing run
The central budget decision for this Glendale Road whole home remodel is whether to move the kitchen sink to the island. In this San Mateo Park / El Cerrito Park house, I recommend keeping the sink on its current run along the wall. The kitchen already features a large island, white cabinetry, light-toned sueded granite countertops, and a skylight, all of which bring light and connection to the living and dining areas. Relocating the sink would require moving plumbing across both slab and raised foundation sections, as this house’s foundation is a mix of concrete perimeter, raised, and slab. Cutting into the slab to reroute a drain is a significant cost and disruption, while the raised areas offer easier access but only in certain zones. Unless a site measure shows the current plumbing cannot support the family’s needs, the expense and complexity of moving the sink are not justified in this home.
Built in 1964, this two-story stucco house with a gable roof and attached two-car garage stands on a 7,885 square foot lot with terraced gardens and mature privacy hedging. The kitchen’s open flow into the living and dining rooms, enhanced by French doors to the patio and gardens, already supports the household’s daily routines and gatherings. The existing finishes, white cabinetry, sueded granite, and warm wood in the primary suite’s double vanity, set a tone that can be extended into the lower level for a cohesive feel. Carrying these materials and a restrained green palette into the family rooms and office below would make the whole home feel intentional, while keeping the kitchen, dining, and living areas as a connected space.
Let the existing open rooms do their work
The open plan in this house is already established: the kitchen flows to the living and dining areas, and French doors link these rooms to the patio and terraced gardens. Removing additional walls would not add value here, especially since the original framing from 1964 is different from the older homes that make up most of San Mateo’s recent sales. According to Redfin’s San Mateo sold data, 82% of single-family homes closed in the last year were built before 1960, but this house’s structure should be evaluated on its own, not by neighborhood averages. Any proposed opening between rooms must be checked for structural needs, given the mixed foundation and the potential for ceiling line changes.
The kitchen range should remain off the island, preserving the current exhaust route. This house’s composition-shingle roof and original ductwork mean that adding a new vent path for a relocated range would complicate the project and risk leaks or awkward roof penetrations. The island works best as a prep and homework space, with a pendant light above, recessed lighting for general use, and under-cabinet lights for tasks. These lighting layers can be tailored to the open kitchen’s needs without overwhelming the ceiling or the adjacent living spaces.
Make the lower level flexible, not louder
On the lower level, this house offers two family rooms, a private office, gym or flex space, a large laundry room, storage, and direct access to the attached garage. The project should give each of these rooms a distinct purpose: one family room can be set up for television, the other for games or conversation, and the office should be positioned away from the main traffic routes. The lower level’s foundation transitions, concrete perimeter, raised, and slab, require careful selection of flooring to ensure smooth, durable transitions, especially along the garage-to-laundry path.
Sound control is important in this layout. Solid-core doors for the office and full-height storage in the family rooms can help contain noise. Area rugs and soft finishes will further reduce sound transfer between zones. The forced-air heating system, original to the house, must be balanced to account for new furniture layouts and room uses, so supply and return paths keep each space comfortable. The living room’s fireplace remains a visual anchor, while the television should be placed on a wall that does not compete with the French doors or garden views.
Plan the electrical work before finishes
This house’s electrical service and panel capacity are not detailed in the available records, so any plan to add an induction range or additional ovens should begin with an electrician confirming the panel’s capacity and the presence of 240-volt circuits. San Mateo’s Reach Codes, effective January 1, 2023, require electric-readiness for panel upgrades and outlets for future electrification in residential remodels. The City of San Mateo’s reach-code page makes this a requirement if the remodel includes electrical work. The owners should confirm the project scope with the City before finalizing construction documents.
The home’s composition-shingle roof, public water supply, and terraced, well-drained lot all shape the project. Roof penetrations for new exhausts must be carefully coordinated, and plumbing changes should be minimized given the mixed foundation. Floor finishes should be chosen to suit the transitions between concrete and raised areas. These decisions keep the budget focused on the rooms and systems the family will use every day, rather than on costly service relocations.
If you live in a house like this one on Glendale Road and want to make it work better for your family, I invite you to get in touch.


